Project Description

TECO, Arc Flash Study, Tampa, Florida
Responsible for studying the Short Circuit Analysis, Protective Device Coordination, and Arc Flash Hazards for various utility power plants. Efforts included field data collection of existing electrical equipment, power plant modelling using ETAP software, processing the various studies and determination of the proposed mitigation measures.

Project Details

Skills Needed:

Categories: