Camana Bay
West Indian Club Camana Bay, Grand Cayman. 500 Acres of Mixed Use Master Planned Community, Total of 18 Blocks of Commercial, Office, Retail, Residential, Recreational, Educational, and Hospitality properties.
Blue Cross Blue Shield Corporate Campus
Blue Cross Blue Shield, Blue Cross Blue Shield Corporate Campus Facility, Jacksonville, FL - $162 Million Dollar, 772,000 SF of Corporate Office Campus Facility consisting of 4 Buildings, 500 Seat Conference Center, 400 Seat Cafeteria, with 2 Elevated Parking Structures. Design of the Power Distribution, Power/Lighting Design, and Fire Alarm Design.
G Leaf – Saxton Facility Expansion
G Leaf – Saxton Facility Expansion – Phase 2, Saxton, PA – 180,000 SF State-of-the-Art indoor grow facility located in Saxton, PA. The facility included 24 Flowering rooms, Vegetation, Clone, and Mother rooms, Dry rooms, Irrigation/Fertigation rooms, Cafeteria, Storage Vaults, and Offices.
Long Center for the Performing Arts, Austin, TX
Long Center, Long Center for the Performing Arts, Austin, TX $77 Million Dollar, 148,000 SF, 2,400 Seat Theater, and a Black Box Studio Theater. Design of the Power Distribution, Power/Lighting Design, and Fire Alarm Design.
Cooper City High School Expansion
Cooper City High School Expansion, Cooper City, FL 3 Story, 36 classroom building in a 48,534 square foot envelope. Design of the Power Distribution Design, Lighting and Controls Design, and Fire Alarm Design.
West Kendall Baptist Hospital, Miami, FL
West Kendall Baptist Hospital, West Kendall Baptist Hospital, Miami, FL 5 Story, 318,040 SF, $66 Million Dollar, 80 Bed Satellite Hospital. Duties consisted of assisting the lead Electrical Engineer in the design of the Nurses Call and Systems Design Only.
Mosaic, New Wales MicroEssentials Project
Mosaic, New Wales MicroEssentials Project, Mulberry, FL Front-end engineering package and detailed design to modify an existing granulation plant to produce a patented MicroEssentials product. Project details included 15kV and 5kV overhead lines, 7.5MVA and 2.5MVA unit substations, arc-rated medium and low voltage switchgear, and intelligent arc-rated medium and low voltage motor control centers. Duties consisted of preparation of capital cost estimate, engineering and construction schedules, and management of production of construction installation package. In addition, assisted in Construction Management and Commissioning services. Project Total Installed Cost (TIC) was approximately $225 MIL.
Mosaic, Energy Enhancement Cogeneration Project
Mosaic, Energy Enhancement Cogeneration Project, Mulberry, Florida Responsible as the Lead Engineer in the preparation of a FEED package for the installation of a new Steam Turbine Generator (50MW), 13.8kV-69kV 50MW Main Substation, and three Heat Recovery Systems (HRS). Project consisted of preparation of capital cost and man hour estimates, one-line diagrams, generator controls, relay protection, specifications and layout of TG Auxiliaries and Step-up Substation (50MVA, 13.8kV - 69kV Transformer).
West Indian Club Camana Bay, Grand Cayman. 500 Acres of Mixed Use Master Planned Community, Total of 18 Blocks of Commercial, Office, Retail, Residential, Recreational, Educational, and Hospitality properties.
Blue Cross Blue Shield, Blue Cross Blue Shield Corporate Campus Facility, Jacksonville, FL - $162 Million Dollar, 772,000 SF of Corporate Office Campus Facility consisting of 4 Buildings, 500 Seat Conference Center, 400 Seat Cafeteria, with 2 Elevated Parking Structures. Design of the Power Distribution, Power/Lighting Design, and Fire Alarm Design.
G Leaf – Saxton Facility Expansion – Phase 2, Saxton, PA – 180,000 SF State-of-the-Art indoor grow facility located in Saxton, PA. The facility included 24 Flowering rooms, Vegetation, Clone, and Mother rooms, Dry rooms, Irrigation/Fertigation rooms, Cafeteria, Storage Vaults, and Offices.
Long Center, Long Center for the Performing Arts, Austin, TX $77 Million Dollar, 148,000 SF, 2,400 Seat Theater, and a Black Box Studio Theater. Design of the Power Distribution, Power/Lighting Design, and Fire Alarm Design.
Cooper City High School Expansion, Cooper City, FL 3 Story, 36 classroom building in a 48,534 square foot envelope. Design of the Power Distribution Design, Lighting and Controls Design, and Fire Alarm Design.
West Kendall Baptist Hospital, West Kendall Baptist Hospital, Miami, FL 5 Story, 318,040 SF, $66 Million Dollar, 80 Bed Satellite Hospital. Duties consisted of assisting the lead Electrical Engineer in the design of the Nurses Call and Systems Design Only.
Mosaic, New Wales MicroEssentials Project, Mulberry, FL Front-end engineering package and detailed design to modify an existing granulation plant to produce a patented MicroEssentials product. Project details included 15kV [...]
Mosaic, Energy Enhancement Cogeneration Project, Mulberry, Florida Responsible as the Lead Engineer in the preparation of a FEED package for the installation of a new Steam Turbine Generator (50MW), 13.8kV-69kV 50MW Main Substation, and three Heat Recovery Systems (HRS). Project consisted of preparation of capital cost and man hour estimates, one-line diagrams, generator controls, relay protection, specifications and layout of TG Auxiliaries and Step-up Substation (50MVA, 13.8kV - 69kV Transformer).